menu
Home / Blog / Technical Insights

Optimizing Compressor Efficiency in Series 5 RTUs

Dr. Alan Grant

Oct 12, 2023 8 min read

The Series 5 Rooftop Unit (RTU) represents a significant leap forward in commercial HVAC efficiency. At its core lies the variable-speed scroll compressor, a component designed to adapt dynamically to the thermal load of the building. Unlike traditional fixed-speed compressors that cycle on and off—creating significant wear and energy spikes—the Series 5 modulation capability ensures a smoother operation curve.

In this technical insight, we explore how proper calibration of the economizer and compressor staging can drastically reduce operational costs while extending the equipment lifecycle.

Understanding the Scroll Compressor Cycle

The scroll compressor utilizes two interleaving scrolls to pump, compress, or pressurize fluids such as liquids and gases. One of the scrolls is fixed, while the other orbits eccentrically without rotating, thereby trapping and pumping or compressing pockets of fluid between the scrolls.

"Proper calibration of the economizer combined with intelligent staging can yield up to 15% energy savings in moderate climates."

When the Series 5 RTU detects a partial load condition, the VFD (Variable Frequency Drive) reduces the motor speed. This reduction follows the affinity laws, where power consumption drops by the cube of the speed reduction. This is where the magic happens for facility managers looking to cut OpEx.

Schematic diagram of HVAC piping system
Figure 1: High-pressure refrigerant lines in a Series 5 assembly.

Key Maintenance Points

To maintain peak efficiency, regular inspection of the suction and discharge pressures is mandatory. A deviation of more than 5% from the manufacturer's curve indicates potential issues with the expansion valve or refrigerant charge.

build

Service Tip: Blower Assembly Critical

Always disconnect main power before servicing the blower assembly. The capacitors in the VFD can hold a lethal charge for up to 5 minutes after power-down. Verify 0V with a multimeter before contact.

Finally, ensure that the condenser coils are cleaned quarterly. Debris buildup acts as an insulator, forcing the compressor to work harder to reject heat, which directly counteracts the efficiency gains of the variable speed technology.

Related Articles

Maintenance

Seasonal Start-up Procedures for Commercial RTUs

Ensure your system is ready for the summer peak with this comprehensive checklist.

Controls

Integrating Series 5 with Building Management Systems

A guide to BACnet and Modbus integration for seamless facility control.

Engineering

Thermodynamics of Modern Heat Exchangers

Understanding the physics behind our patented micro-channel coils.

Become a Certified Dealer

Join the B&A North America network and offer your clients the most efficient RTUs on the market.